2010-03-28

Progress so far

So far the following are completed
  • Wiring and Light fixtures
  • Paint
  • Kitchen Cabinets, Built in Wardrobes, Study tables, dressing tables, TV shelf... 95% done.


Paint color:
  • Plain Maxilite white on ceilings
  • Almond white on 80% of all walls
  • Orange red on Dining wall
  • Green on one wall of each bedroom

Below are latest pictures taken last weekend


Balcony Area



TV Area


Kitchen Entrance from Living Area

Kitchen Area - Stove

E2Saver gadget next to the fusebox


From Main Entrance door looking at dining area



Study area


Bedroom


Built in Wardrobe



Tomorrow:
  • Install curtains
  • Final work on cabinets
  • Connect plumbing to kitchen sink

No comments:

Observations of an Incredible Person! Positive self talk is half the battle!